Net present value: Difference between revisions
imported>Utkarshraj Atmaram m (li) |
imported>Warren Schudy mNo edit summary |
||
Line 1: | Line 1: | ||
{{subpages}} | {{subpages}} | ||
{{EZarticle}} | |||
In [[finance]], the '''net present value''' (NPV) of a investment project is the difference between the [[present value]] of the stream of [[cash flow]]s generated by this project and the value of the initial investment. If the result is positive, then the project could be undertaken, otherwise it should be refused. | In [[finance]], the '''net present value''' (NPV) of a investment project is the difference between the [[present value]] of the stream of [[cash flow]]s generated by this project and the value of the initial investment. If the result is positive, then the project could be undertaken, otherwise it should be refused. | ||
Revision as of 00:10, 19 February 2008
In finance, the net present value (NPV) of a investment project is the difference between the present value of the stream of cash flows generated by this project and the value of the initial investment. If the result is positive, then the project could be undertaken, otherwise it should be refused.
Formula
The NPV of a project generating cash flows during n periods is given by the formula :
Failed to parse (SVG (MathML can be enabled via browser plugin): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle \mbox{NPV} = \sum_{t=1}^{n} \frac{C_t}{(1+r)^{t}} - {I}}
Where
- Failed to parse (SVG (MathML can be enabled via browser plugin): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle t}
is the time of the cash flow
- Failed to parse (SVG (MathML can be enabled via browser plugin): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle r}
is the discount rate
- Failed to parse (SVG (MathML can be enabled via browser plugin): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle C_t}
is the net cash flow (the amount of cash) at time t.
- Failed to parse (SVG (MathML can be enabled via browser plugin): Invalid response ("Math extension cannot connect to Restbase.") from server "https://wikimedia.org/api/rest_v1/":): {\displaystyle I} is the initial investment outlay.
Principle
The NPV enables to compare the cost of an investment and the income it generated in regard of the opportunity cost of capital and sometimes of the level of risk associated to it.
Comparing the cost of a project and the income it generated is not enough to conclude whether it is a good project or not. Indeed the value of a amount of money today and the value of the same amount at time t in the future are different, because this amount could be deposited in a bank account from today to time t and yield interest. The NPV takes into account this parameter.
Conclusions
- When investors evaluate a investment project, they undertake it when its NPV is positive.
- When they evaluate several projects mutually exclusive they choose the project with the highest positive NPV.