Template:Nuclear power reconsidered/Metadata: Difference between revisions
Jump to navigation
Jump to search
imported>David MacQuigg mNo edit summary |
(status to 1: developed, not yet approved) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 6: | Line 6: | ||
| abc = Nuclear power reconsidered | | abc = Nuclear power reconsidered | ||
| cat_check = yes | | cat_check = yes | ||
| status = | | status = 1 | ||
| underlinked = yes | | underlinked = yes | ||
| cleanup = no | | cleanup = no | ||
Line 12: | Line 12: | ||
| cat1 = Engineering | | cat1 = Engineering | ||
| cat2 = Physics | | cat2 = Physics | ||
| cat3 = | | cat3 = Economics | ||
| sub1 = Nuclear Engineering | | sub1 = Nuclear Engineering | ||
| sub2 = | | sub2 = |
Latest revision as of 19:48, 19 April 2023
Click here to edit this metadata using the metadata form.
This is a central location for all information relating to the Nuclear power reconsidered cluster. It is critical to keep this page updated since the {{subpages}} and related templates use this information for the placement of categories and header templates in the cluster. General article properties
- pagename = Nuclear power reconsidered
- variant = AE
- Article size = 23,576 bytes
- Cluster subpages
Required for checklist
- abc = Nuclear power reconsidered
- cat_check = yes
- status = 1
- underlinked = yes
- cleanup = no
- Workgroup designations:
- cat1 = Engineering
- cat2 = Physics
- cat3 = Economics
- Subworkgroup designations:
- sub1= Nuclear Engineering
- sub2=
- sub3=
- Article specific tabs:
- tab1=
- tab2=
- tab3=
Required for the ToApprove template
- article url =
- subpage url =
- cluster =
- now =
- ToA editor =
- ToA editor2 =
- ToA editor3 =
- ToA editor4 =
- date =
Required for the Approved template
- The status parameter in the checklist (see above) of approved versions must be set to 0 (zero).
- A editor =
- A editor2 =
- A editor3 =
- A editor4 =