San Diego and Arizona Railway/Gallery: Difference between revisions
Jump to navigation
Jump to search
imported>Robert A. Estremo m (add image) |
imported>Robert A. Estremo m (add image) |
||
Line 15: | Line 15: | ||
Image:SDA 25 tunnel 16.jpg|{{SDA 25 tunnel 16.jpg/credit}}<br />SD&A No. 25 and train have just emerged from Tunnel #16 westbound. | Image:SDA 25 tunnel 16.jpg|{{SDA 25 tunnel 16.jpg/credit}}<br />SD&A No. 25 and train have just emerged from Tunnel #16 westbound. | ||
Image:Lines of the SDA.jpg|{{Lines of the SDA.jpg/credit}}<br />Lines of the San Diego and Arizona Railway in California, and the Tijuana and Tecate Railway in Mexico. | Image:Lines of the SDA.jpg|{{Lines of the SDA.jpg/credit}}<br />Lines of the San Diego and Arizona Railway in California, and the Tijuana and Tecate Railway in Mexico. | ||
Image:SDA timetable 1920.jpg|{{SDA timetable 1920.jpg/credit}}<br />A 1920 timetable cover for the San Diego and Arizona Railway reflects the railroad's eastern interchange with the Southern Pacific. | |||
</gallery> | </gallery> | ||
==Notes and references== | ==Notes and references== | ||
{{reflist}} | {{reflist}} |
Revision as of 21:30, 4 August 2013
(PD) Photo: Unknown
Frank Forward, Sr. (mayor of San Diego) turns the first shovelful of dirt to ceremonially commence construction of the San Diego and Arizona Railway on September 7, 1907. At left is Frank Kimball, a prominent local landowner and rancher,[1] and to the right is real estate developer Alonzo Horton.(PD) Photo: Unknown
The upper Campo Creek Viaduct, "...surely the most photographed bridge [on the SD&A]..." is nearly 600 feet (183 meters) long.[2] The steel structure was completed on October 5, 1919.
Notes and references
- ↑ Kimball also represented the Chamber of Commerce and the Board of City Trustees of San Diego, and helped organize the Atchison, Topeka and Santa Fe Railway's subsidiary line the California Southern Railroad.
- ↑ Hanft, pp. 200-201