Capability Maturity Model Integration/Related Articles: Difference between revisions
Jump to navigation
Jump to search
imported>Housekeeping Bot m (Automated edit: Adding CZ:Workgroups to Category:Bot-created Related Articles subpages) |
No edit summary |
||
Line 20: | Line 20: | ||
{{Bot-created_related_article_subpage}} | {{Bot-created_related_article_subpage}} | ||
<!-- Remove the section above after copying links to the other sections. --> | <!-- Remove the section above after copying links to the other sections. --> | ||
==Articles related by keyphrases (Bot populated)== | |||
{{r|Program evaluation}} | |||
{{r|Capability Maturity Model}} | |||
{{r|Process control chart}} |
Latest revision as of 16:00, 24 July 2024
- See also changes related to Capability Maturity Model Integration, or pages that link to Capability Maturity Model Integration or to this page or whose text contains "Capability Maturity Model Integration".
Parent topics
Subtopics
Bot-suggested topics
Auto-populated based on Special:WhatLinksHere/Capability Maturity Model Integration. Needs checking by a human.
- Capability Maturity Model [r]: Add brief definition or description
- List of topics in software engineering [r]: Add brief definition or description
- Software Engineering Institute [r]: Add brief definition or description
- Program evaluation [r]: the systematic collection, assessment, and dissemination of information about a particular program, project, or policy. [e]
- Capability Maturity Model [r]: Add brief definition or description
- Process control chart [r]: Tabulated graphical arrangement of test results and other pertinent data for each procedure, arranged in chronological sequence for the entire assessment. [e]